PROVEN FIELD CASE STUDIES

Proven Field Case Studies & Reliability Milestones

Documented operational performance, +350% MTBF extensions, zero-leak startups, and millions saved across Saudi Arabia.

Field Engineering Success & Reliability
+350%
MTBF Extension
0.00 LTI
180k+ Safe Hours
+350%
MTBF Life Extension (Boiler Feed Pumps)
0.00 LTI
180k+ Safe Hours (Refinery Turnaround)
72 Hours
Ahead of Schedule (140 Exchangers)
$1.8M+
Annual Outage & Flaring Costs Saved
Power & Utilities • Rabigh

14-Stage Boiler Feed Pump Re-Engineering (+350% MTBF)

Challenge: Chronic trips every 5 months due to severe cavitation, impeller erosion & shaft deflection.
Solution: Super Duplex impellers, ISO G1.0 balancing on 10T rig, API 682 Plan 53B dual seals & laser alignment.
Impact: Runtime extended to 24+ months, saving over $680,000 in unplanned outage losses.
+350%
Continuous Runtime
Increased from 5 to 24+ months
$680K+ Outage Loss Saved
Refining & Petrochemicals • Yanbu

Major Turnaround Overhaul of 140 Exchangers (45 Days, 0.00 LTI)

Challenge: Critical 45-day TAR requiring bundle pulling, hydrojetting, retubing & 850 leak-free joints.
Solution: 120-man task force, mobile extractors, on-site retubing & ASME PCC-1 hydraulic torque tensioning.
Impact: Delivered 72 hours ahead of schedule with 180,000 safe hours and 100% leak-free startup.
0.00 LTI
180k Safe Work Hours
100% First-Pass Leak-Free Startup
72 Hours Ahead of Schedule
Petrochemicals • Jubail Industrial City

Hydrogen Compressor Dry Gas Seal Retrofit (API 692)

Challenge: Chronic hydrogen leakage across wet seals at 110 bar, causing gas flaring & high oil costs.
Solution: Converted to API 692 Tandem Dry Gas Seals with cleanroom helium lapping & 150-bar N2 dynamic testing.
Impact: Zero flaring achieved, $450,000 annual seal oil savings, and seamless 36-month run cycle.
$450K/yr
Seal Oil & Flaring Savings
API 692 DGS Conversion
Zero Flaring Milestone
Mining & Heavy Industry • Eastern Province

6.6kV 3,500kW SAG Mill Motor Emergency Rewind in 9 Days

Challenge: Stator short halted primary ore mill; European OEM quoted a 6-month replacement lead time.
Solution: In-house Class H mica-glass diamond coils, dual-cycle VPI impregnation & 13.8kV Hi-Pot testing in Jeddah.
Impact: Fully commissioned on-site in 9 days, resuming 12,000 tons/day mineral processing.
9 Days
Turnaround vs 6-Mo OEM
6.6kV 3,500kW Rewind + VPI
12,000 T/Day Resumed

Ready to Maximize Your Plant MTBF & Reliability?

Contact our reliability engineering team for a customized asset feasibility study, turnaround planning, or emergency dispatch.

APPROVED INDUSTRIAL PARTNER Trusted by the Kingdom's Critical Energy, Petrochemical & Utility Plants
Saudi Aramco
SABIC
Ma'aden Mining
Sadara Chemical Company
Saudi Electricity / Energy Company
Saudi Aramco
SABIC
Ma'aden Mining
Sadara Chemical Company
Saudi Electricity / Energy Company